| Home| Contact Us| Locations |
 |
|
Economy HD Building Line
EASY-BOLT PREFABRICATED STEEL BUILDINGS
THE EXCLUSIVE METAL MART SIMPLIFIED SYSTEM
 |
MULTIPLE BAY
STEEL BUILDINGS
IBC 10-5-90 MPH |
 |
|
ECONOMY HD STORAGE CENTER
width:30' x length:40' x height:10'
One 10' x 8' Framed Opening in End Wall
ECONOMY HD STORAGE CENTER
width:30' x length:40' x height:12'
One 10' x 10' Framed Opening in End Wall
ECONOMY HD XL STORAGE CENTER
width:40' x length:50' x height:12'
One 10' x 10' Framed Opening in End Wall
(Other Sizes and Add-On Bays Available!)
. NO WELDING REQUIRED . CLIPS WELDED IN PLACE . ASSEMBLY VIDEO . ANCHOR BOLT TEMPLATES . MARKED FRAME COMPONENTS . SHORT LEAD TIME .All buildings meet IBC Code.
ALL BUILDING LINE PACKAGES INCLUDE:
. BOLT TOGETHER FRAME . 20 YEAR WARRANTY GALVALUME ROOF PANELS
. COMMODITY GRADE PAINTED 26 GAUGE WALL PANELS
. COMPLETE TRIM PACKAGE . ANCHOR BOLTS . ERECTION DRAWINGS . TRIM, SCREWS, CLOSURES AND SEALANT TAPE . ASSEMBLY VIDEO .
|
(Photo shown with options.)
The Ratings
10 = Live Load on Frames in lbs. per sq. ft.
5 = Snow Load on Roof in lbs. per sq. ft.
90 = MPH Wind Load on the Building. |
 |
Real Value Comparison |
METAL MART
20 Year Minimum Roof Warranty
All Buildings Have Minimum Certified Snow Loads
54 Clips Welded in Place
12 Trim Colors to Choose From at No Additional Cost
Interchangeable Roof & Sidewall Purlins & Girts
Flexible Framed Opening Locations
Marked Frame Components |
COMPETITION
5 Year Warranty on Some
No Certified Snow Loads on Some
Loose Clips in Sack, Assembly Requires 16 Additional Man Hours
Only 2 Choices with Extra Costs for Other Colors with Some
Non-Interchangeable
One Fixed Location, No Flexibility
Not Marked, Difficult Assembly
|
|
|
|
|
|
 |
|